
CHENNAI, Aug. 4:The contruction of two bridges, one across Rajaji Salai and the other across GST road, which was hitherto bogged down by operational difficulties is likely to take off as the problem seems to have been sorted out. At Guindy the issue of regulating vehicular traffic on GST Road was a problem while at Royapuram putting up a third line for storing materials needs for the Railways to construct its portion over the track near the Chennai Port gate came in the way of smooth implementation.